Democratic Underground Latest Greatest Lobby Journals Search Options Help Login
Google

WWL Baton Rouge reporting from live ACoE press conference

Printer-friendly format Printer-friendly format
Printer-friendly format Email this thread to a friend
Printer-friendly format Bookmark this thread
This topic is archived.
Home » Discuss » Archives » General Discussion (Through 2005) Donate to DU
 
magellan Donating Member (1000+ posts) Send PM | Profile | Ignore Sun Sep-04-05 06:09 PM
Original message
WWL Baton Rouge reporting from live ACoE press conference
Contractors working 17th Street canal breach were fired at, not shot. Didn't hear more, like who or why.

On the water being pumped out, ACoE was asked "Isn't the water flowing out a threat to the environment, marine life?" He replied, "No, ma'am."

Well! Clearly the ACoE have things under total control.
:sarcasm:
Printer Friendly | Permalink |  | Top
AlamoDemoc Donating Member (1000+ posts) Send PM | Profile | Ignore Sun Sep-04-05 06:13 PM
Response to Original message
1. Why do people like this asshole hold press conferences
Edited on Sun Sep-04-05 06:13 PM by AlamoDemoc
if they don't have a clue of what is going on?
Printer Friendly | Permalink |  | Top
 
magellan Donating Member (1000+ posts) Send PM | Profile | Ignore Sun Sep-04-05 06:20 PM
Response to Original message
2. More...contractors were fired upon, but no one was injured.
Asked Bad on morale? No, since these contractors have been in Iraq. (A follow up says NOPD did indeed shoot gunmen.)

Setting up pumps every night. NOLA East, 24 pumps are repaired. Water is being pumped from canals into Lake Ponchatrain.

Their schedule is to de-water pumping station 6 (at the end of 17th street canal) so they can assess damage. Pumping station 6 is largest pumping station in city.

Logistics are a nightmare but they are very close to repairing breach at 17th street canal. Will be complete tonight. They can then begin assessing damage of pumping station 6.

There was a rumor that a barge broke loose and caused the breach of the 17th street canal. Denied.

After all pumps are repaired, 80 days max worst case to de-water city.

Mike Rogers with ACoE speaking.
Printer Friendly | Permalink |  | Top
 
ellenfl Donating Member (1000+ posts) Send PM | Profile | Ignore Sun Sep-04-05 07:10 PM
Response to Original message
3. some official on 60 minutes
said that the levee didn't breach, it overflowed and that they would not have been able to fix it beforehand. said it would have taken years(?) a bushbot maybe?

ellen fl
Printer Friendly | Permalink |  | Top
 
Zynx Donating Member (1000+ posts) Send PM | Profile | Ignore Mon Sep-05-05 01:14 AM
Response to Reply #3
4. Um, levee most certainly broke.
Printer Friendly | Permalink |  | Top
 
DU AdBot (1000+ posts) Click to send private message to this author Click to view 
this author's profile Click to add 
this author to your buddy list Click to add 
this author to your Ignore list Thu Dec 26th 2024, 09:25 PM
Response to Original message
Advertisements [?]
 Top

Home » Discuss » Archives » General Discussion (Through 2005) Donate to DU

Powered by DCForum+ Version 1.1 Copyright 1997-2002 DCScripts.com
Software has been extensively modified by the DU administrators


Important Notices: By participating on this discussion board, visitors agree to abide by the rules outlined on our Rules page. Messages posted on the Democratic Underground Discussion Forums are the opinions of the individuals who post them, and do not necessarily represent the opinions of Democratic Underground, LLC.

Home  |  Discussion Forums  |  Journals |  Store  |  Donate

About DU  |  Contact Us  |  Privacy Policy

Got a message for Democratic Underground? Click here to send us a message.

© 2001 - 2011 Democratic Underground, LLC