Democratic Underground Latest Greatest Lobby Journals Search Options Help Login
Google

Study: Billions Needed to Deliver Wind Power to Eastern Interconnection

Printer-friendly format Printer-friendly format
Printer-friendly format Email this thread to a friend
Printer-friendly format Bookmark this thread
This topic is archived.
Home » Discuss » Topic Forums » Environment/Energy Donate to DU
 
jpak Donating Member (1000+ posts) Send PM | Profile | Ignore Fri Feb-13-09 10:57 AM
Original message
Study: Billions Needed to Deliver Wind Power to Eastern Interconnection
http://tdworld.com/news/joint-coordinated-system-plan-wind-0209/

The Joint Coordinated System Plan, the first step of a transmission and generation system expansion analysis of the majority of the Eastern Interconnection, estimates the electricity sector will need over $80 billion in new transmission infrastructure to obtain 20% of the region's electricity from wind generation.

This initial analysis, which was performed with participation from major transmission owners and operators in the Eastern U.S., looked at two scenarios to examine transmission and generation possibilities between 2008 and 2024. The first, a Reference Scenario, assumes "business as usual" with respect to wind development, with approximately 5% of the region's energy coming from wind. The second was a 20% Wind Energy Scenario and was based on the U.S. Department of Energy's Eastern Wind Integration and Transmission Study.

"We believe that, although JCSP'08 examined a small set of scenarios with limited variables, this study nonetheless gives a clear idea of the scale of commitment it will take to integrate large amounts of renewable resources into the grid," said John Bear, president and CEO of the Midwest ISO. "This is information we believe that our leaders need to consider as they begin work under a new administration and start defining our energy future."

JCSP'08 estimates that incorporating 5% wind energy (the "Reference Scenario") will require the addition of approximately 10,000 miles of new extra-high voltage transmission at a cost of approximately $50 billion, in addition to nearly $700 billion in total generation capital costs by 2024.

<more>
Printer Friendly | Permalink |  | Top

Home » Discuss » Topic Forums » Environment/Energy Donate to DU

Powered by DCForum+ Version 1.1 Copyright 1997-2002 DCScripts.com
Software has been extensively modified by the DU administrators


Important Notices: By participating on this discussion board, visitors agree to abide by the rules outlined on our Rules page. Messages posted on the Democratic Underground Discussion Forums are the opinions of the individuals who post them, and do not necessarily represent the opinions of Democratic Underground, LLC.

Home  |  Discussion Forums  |  Journals |  Store  |  Donate

About DU  |  Contact Us  |  Privacy Policy

Got a message for Democratic Underground? Click here to send us a message.

© 2001 - 2011 Democratic Underground, LLC