NNadir Donating Member (1000+ posts) Send PM | Profile | Ignore Tue Mar-20-07 08:40 AM
Original message
California to rachet up wind power by 65% - one small problem...
Edited on Tue Mar-20-07 08:42 AM by NNadir
...there's nothing with which to connect it.

The massive 1,500 megawatt wind power deal announced Thursday by utility Southern California Edison (EIX) and a subsidiary of Australian company Allco Finance will crank up California’s wind energy capacity by 65 percent. That will go a long way in helping the state meet a mandatory target of generating 20 percent of its electricity from renewable sources by 2010. But renewable energy projects like the huge wind farms to be built in SoCal’s Tehachapi region face a big hurdle: insufficient or non-existent transmission lines to connect the windy and sunny parts of California to the power grid. Yesterday, as the Tehachapi project was being announced, the California Energy Commission released a report warning that, “the lack of transmission infrastructure to access remote renewable resources is the most critical barrier to meeting California’s 20 percent target by 2010.”

“Despite efforts by utilities and the renewable industry in working groups for the Tehachapi wind area and Imperial Valley geothermal and solar resources areas,” the report continued, “California’s efforts to spur investments in renewable transmission infrastructure have not yet been successful. Unless these challenges are resolved, renewable transmission projects will continue to languish.” The energy commission identified the Antelope Transmission Project as crucial if big Tehachapi wind farms like those envisioned by Southern California Edison are to be built. The Antelope transmission project would allow 700 megawatts of wind power to be sent to the Southern California power grid.


http://www.wind-watch.org/news/2006/12/23/big-california-wind-power-deal-faces-gridlock/

Bummer. Devil's in the details I guess.

I wonder if, upon failure to meet the 2010 "mandatory" renewable "mandate" they will mandatorily shut off power to parts of California?
Printer Friendly | Permalink |  | Top
TreasonousBastard Donating Member (1000+ posts) Send PM | Profile | Ignore Tue Mar-20-07 08:56 AM
Response to Original message
1. The transmission lines will be built...
this sounds like some drum-thumping PR to get them to hurry up about it.

Printer Friendly | Permalink |  | Top
 
HereSince1628 Donating Member (1000+ posts) Send PM | Profile | Ignore Tue Mar-20-07 09:08 AM
Response to Reply #1
2. Really. If you couldn't distribute the product why would you enter a contract
to build a windfarm? Businesses are into profit not loss.

Printer Friendly | Permalink |  | Top
 
NNadir Donating Member (1000+ posts) Send PM | Profile | Ignore Tue Mar-20-07 09:22 AM
Response to Reply #2
4. Businesses are often into marketing and public relations.
It would hardly be the first time that a business represented that it was doing one thing while actually is doing another.

For instance in the electricity business, people often build one demonstration scale IGCC coal plant to obscure the fact that they are building many more huge normal coal plants.

Germany for instance, is building vast new coal capacity and is misrepresenting what it is doing by building a little IGCC coal plant that "could" sequester carbon dioxide (if they had a place for it.) The tiny IGCC plant - which will actually sequester zero carbon dioxide but "could" - is designed to divert attention from the 8 full size normal power plants they are building.

California burns a shit load of natural gas, a dangerous fuel that is destroying the atmosphere. They are building another 1,828 MWe of new natural gas electricity.

http://www.eia.doe.gov/cneaf/electricity/epa/planned_capacity_state.xls

Why?



Printer Friendly | Permalink |  | Top
 
HereSince1628 Donating Member (1000+ posts) Send PM | Profile | Ignore Tue Mar-20-07 09:39 AM
Response to Reply #4
5. Well, there's no doubt businesses play in the public arena.
And there is no doubt that in the current loose reign regulatory environment they play as fast and loose with the public as they can.
Printer Friendly | Permalink |  | Top
 
XemaSab Donating Member (1000+ posts) Send PM | Profile | Ignore Tue Mar-20-07 12:05 PM
Response to Reply #5
9. Hey... I'm currently working on a transmission project
and that's simply not the case.
Printer Friendly | Permalink |  | Top
 
NNadir Donating Member (1000+ posts) Send PM | Profile | Ignore Tue Mar-20-07 12:18 PM
Response to Reply #9
11. OK then. You know and I don't.
I defer to your direct experience and appreciate your correction.
Printer Friendly | Permalink |  | Top
 
NNadir Donating Member (1000+ posts) Send PM | Profile | Ignore Tue Mar-20-07 01:01 PM
Response to Reply #9
14. Now that I have deferred to your report on this matter, I would be
interested to hear your comments on this post:

http://www.democraticunderground.com/discuss/duboard.php?az=show_mesg&forum=115&topic_id=88306&mesg_id=88318

True or untrue to your knowledge? (The part about the August 2006 heat wave and wind power.)
Printer Friendly | Permalink |  | Top
 
Solo_in_MD Donating Member (1000+ posts) Send PM | Profile | Ignore Tue Mar-20-07 09:16 AM
Response to Original message
3. Given the amount of windmills already there, there has to be basic infrastructure in place
That can be doubled up if needed. The easements are already there which is often the biggest issue.
Printer Friendly | Permalink |  | Top
 
NNadir Donating Member (1000+ posts) Send PM | Profile | Ignore Tue Mar-20-07 11:37 AM
Response to Reply #3
7. Easier said than done, I think.
Printer Friendly | Permalink |  | Top
 
Schema Thing Donating Member (1000+ posts) Send PM | Profile | Ignore Tue Mar-20-07 09:48 AM
Response to Original message
6. Can't they just bring it down to the cities by pack mule?
Printer Friendly | Permalink |  | Top
 
NNadir Donating Member (1000+ posts) Send PM | Profile | Ignore Tue Mar-20-07 11:37 AM
Response to Reply #6
8. I wonder...
Printer Friendly | Permalink |  | Top
 
XemaSab Donating Member (1000+ posts) Send PM | Profile | Ignore Tue Mar-20-07 12:07 PM
Response to Original message
10. Our company alone has several MASSIVE
transmission line projects from the desert to the city.

It's good times. B-)
Printer Friendly | Permalink |  | Top
 
oldhippie Donating Member (355 posts) Send PM | Profile | Ignore Tue Mar-20-07 12:23 PM
Response to Reply #10
12. Could you describe them?
I'm genuinely curious.
Printer Friendly | Permalink |  | Top
 
XemaSab Donating Member (1000+ posts) Send PM | Profile | Ignore Tue Mar-20-07 11:46 PM
Response to Reply #12
15. What do you want to know?
:shrug:
Printer Friendly | Permalink |  | Top
 
cally Donating Member (1000+ posts) Send PM | Profile | Ignore Tue Mar-20-07 12:48 PM
Response to Reply #10
13. I'm curious if the problem is getting the easements
Do you know if most of the companies developing transmission lines have the easements?
Printer Friendly | Permalink |  | Top
 
XemaSab Donating Member (1000+ posts) Send PM | Profile | Ignore Tue Mar-20-07 11:49 PM
Response to Reply #13
16. I think a lot of it is on BLM lands or in existing easements.
We've got a few proposed routes in case one route or another becomes problematic. :P

Printer Friendly | Permalink |  | Top
 
DU AdBot (1000+ posts) Click to send private message to this author Click to view 
this author's profile Click to add 
this author to your buddy list Click to add 
this author to your Ignore list Mon Jan 13th 2025, 06:41 PM
Response to Original message
Advertisements [?]
 Top

Home » Discuss » Topic Forums » Environment/Energy Donate to DU

Powered by DCForum+ Version 1.1 Copyright 1997-2002 DCScripts.com
Software has been extensively modified by the DU administrators


Important Notices: By participating on this discussion board, visitors agree to abide by the rules outlined on our Rules page. Messages posted on the Democratic Underground Discussion Forums are the opinions of the individuals who post them, and do not necessarily represent the opinions of Democratic Underground, LLC.

Home  |  Discussion Forums  |  Journals |  Store  |  Donate

About DU  |  Contact Us  |  Privacy Policy

Got a message for Democratic Underground? Click here to send us a message.

© 2001 - 2011 Democratic Underground, LLC