Democratic Underground Latest Greatest Lobby Journals Search Options Help Login
Google

Anyone get this email?

Printer-friendly format Printer-friendly format
Printer-friendly format Email this thread to a friend
Printer-friendly format Bookmark this thread
Home » Discuss » DU Groups » Activism » Propaganda Debunking Group Donate to DU
 
zeos3 Donating Member (912 posts) Send PM | Profile | Ignore Fri Mar-13-09 07:01 PM
Original message
Anyone get this email?
11 Most Expensive Catastrophes in History

# 11. Titanic - $150 Million


The sinking of the Titanic is possibly the most famous accident in the world. But it barely makes our list of top 10 most expensive. On April 15, 1912, the Titanic sank on its maiden voyage and was considered to be the most luxurious ocean liner ever built. Over 1,500 people lost their lives when the ship ran into an iceberg and sunk in frigid waters. The ship cost $7 million to build ($150 million in today ' s dollars).

# 10. Tanker Truck vs Bridge - $358 Million

On August 26, 2004, a car collided with a tanker truck containing 32,000 liters of fuel on the Wiehltal Bridge in Germany . The tanker crashed through the guardrail and fell 90 feet off the A4 Autobahn resulting in a huge explosion and fire which destroyed the load-bearing ability of the bridge. Temporary repairs cost $40 million and the cost to replace the bridge is estimated at $318 Million.



# 9. MetroLink Crash - $500 Million

On September 12, 2008, in what was one of the worst train crashes in California history, 25 people were killed when a Metrolink commuter train crashed head-on into a Union Pacific freight train in Los Angeles . It is thought that the Metrolink train may have run through a red signal while the conductor was busy text messaging.. Wrongful death lawsuits are expected to cause $500 million in losses for Metrolink.


# 8. B-2 Bomber Crash - $1.4 Billion

Here we have our first billion dollar accident (and we ' re only #7 on the list). This B-2 stealth bomber crashed shortly after taking off from an air base in Guam on February 23, 2008. Investigators blamed distorted data in the flight control computers caused by moisture in the system. This resulted in the aircraft making a sudden nose-up move which made the B-2 stall and crash. This was 1 of only 21 ever built and was the most expensive aviation accident in history. Both pilots were able to eject to safety.





# 7. Exxon Valdez - $2.5 Billion

The Exxon Valdez oil spill was not a large one in relation to the world ' s biggest oil spills, but it was a costly one due to the remote location of Prince William Sound (accessible only by helicopter and boat). On March 24, 1989, 10.8 million gallons of oil was spilled when the ship ' s master, Joseph Hazelwood, left the controls and the ship crashed into a Reef. The cleanup cost Exxon $2.5 billion.



# 6. Piper Alpha Oil Rig - $3.4 Billion

The world ' s worst off-shore oil disaster. At one time, it was the world ' s single largest oil producer, spewing out 317,000 barrels of oil per day. On July 6, 1988, as part of routine maintenance, technicians removed and checked safety valves which were essential in preventing dangerous build-up of liquid gas. There were 100 identical safety valves which were checked. Unfortunately, the technicians made a mistake and forgot to replace one of them. At 10 PM that same night, a technician pressed a start button for the liquid gas pumps and the world ' s most expensive oil rig accident was set in motion.

Within 2 hours, the 300 foot platform was engulfed in flames. It eventually collapsed, killing 167 workers and resulting in $3.4 Billion in damages.



# 5. Challenger Explosion - $5.5 Billion

The Space Shuttle Challenger was destroyed 73 seconds after takeoff due on January 28, 1986 due to a faulty O-ring. It failed to seal one of the joints, allowing pressurized gas to reach the outside. This in turn caused the external tank to dump its payload of liquid hydrogen causing a massive explosion. The cost of replacing the Space Shuttle was $2 billion in 1986 ($4.5 billion in today ' s dollars). The cost of investigation, problem correction, and replacement of lost equipment cost $450 million from 1986-1987 ($1 Billion in today ' s dollars).



# 4. Prestige Oil Spill - $12 Billion

On November 13, 2002, the Prestige oil tanker was carrying 77,000 tons of heavy fuel oil when one of its twelve tanks burst during a storm off Galicia , Spain . Fearing that the ship would sink, the captain called for help from Spanish rescue workers, expecting them to take the ship into harbour. However, pressure from local authorities forced the captain to steer the ship away from the coast. The captain tried to get help from the French and Portuguese authorities, but they too ordered the ship away from their shores. The storm eventually took its toll on the ship resulting in the tanker splitting in half and releasing 20 million gallons oil into the sea.

According to a report by the Pontevedra Economist Board, the total cleanup cost $12 billion.



# 3. Space Shuttle Columbia - $13 Billion

The Space Shuttle Columbia was the first space worthy shuttle in NASA ' s orbital fleet. It was destroyed during re-entry over Texas on February 1, 2003 after a hole was punctured in one of the wings during launch 16 days earlier. The original cost of the shuttle was $2 Billion in 1978. That comes out to $6.3 Billion in today ' s dollars. $500 million was spent on the investigation, making it the costliest aircraft accident investigation in history. The search and recovery of debris cost $300 million.

In the end, the total cost of the accident (not including replacement of the shuttle) came out to $13 Billion according to the American Institute of Aeronautics and Astronautics..


# 2. Chernobyl - $200 Billion

On April 26, 1986, the world witnessed the costliest accident in history. The Chernobyl disaster has been called the biggest socio-economic catastrophe in peacetime history. 50% of the area of Ukraine is in some way contaminated. Over 200,000 people had to be evacuated and resettled while 1.7 million people were directly affected by the disaster. The death toll attributed to Chernobyl , including people who died from cancer years later, is estimated at 125,000. The total costs including cleanup, resettlement, and compensation to victims has been estimated to be roughly $200 Billion. The cost of a new steel shelter for the Chernobyl nuclear plant will cost $2 billion alone. The accident was officially attributed to power plant operators who violated plant procedures and were ignorant of the safety requirements needed.



# 1. 2008 Presidential Election- $800 Billion in the first two months………..



Refresh | 0 Recommendations Printer Friendly | Permalink | Reply | Top
SheilaT Donating Member (1000+ posts) Send PM | Profile | Ignore Tue Mar-17-09 08:19 AM
Response to Original message
1. There's something suspiciously
familiar about this, as if I've seen it in a different context -- maybe something connected to the Clinton years perhaps? I did a quick Snopes search and don't find it there.

The main thing to point out is that it's extremely offensive equate genuine disasters where lives and property were lost to money spent -- about half of which, if I'm not mistaken -- was authorized under Bush -- on bailing out companies which deliberately mismanaged themselves and lost billions, laid off thousands upon thousands of workers and destroyed the life savings of millions of hard-working Americans.

So maybe respond with a list of how many died fighting Bush's illegal, immoral war. Note that Katrina, which was a multi-billion dollar disaster and cost an unknown number of hundreds of lives, occurred under Bush's watch. Remember famously that someone in his administration was blissfully unaware of those trapped in the Astrodome until watching TV some days after the storm?

Also, job losses under Bush were constant his entire eight years. Despite claims of a strong economy, I believe that there was at most one year during which more jobs were created than lost. I'm not sure and haven't bothered to research that, but I do recall quite clearly in the run-up to the 2004 election that jobs had been lost during his entire time up to then.
Printer Friendly | Permalink | Reply | Top
 
stewartcolbert08 Donating Member (614 posts) Send PM | Profile | Ignore Tue May-12-09 01:19 AM
Response to Original message
2. yes i got this one too
only the end of mine said something about when obama got elected it costed the country like a certain billion in the first few months, its just stupid ass right wingers trying to be witty and clever!
Printer Friendly | Permalink | Reply | Top
 
livefreest Donating Member (378 posts) Send PM | Profile | Ignore Wed May-13-09 04:38 AM
Response to Original message
3. what's the sender's email?
Printer Friendly | Permalink | Reply | Top
 
DU AdBot (1000+ posts) Click to send private message to this author Click to view 
this author's profile Click to add 
this author to your buddy list Click to add 
this author to your Ignore list Sun Dec 22nd 2024, 05:40 AM
Response to Original message
Advertisements [?]
 Top

Home » Discuss » DU Groups » Activism » Propaganda Debunking Group Donate to DU

Powered by DCForum+ Version 1.1 Copyright 1997-2002 DCScripts.com
Software has been extensively modified by the DU administrators


Important Notices: By participating on this discussion board, visitors agree to abide by the rules outlined on our Rules page. Messages posted on the Democratic Underground Discussion Forums are the opinions of the individuals who post them, and do not necessarily represent the opinions of Democratic Underground, LLC.

Home  |  Discussion Forums  |  Journals |  Store  |  Donate

About DU  |  Contact Us  |  Privacy Policy

Got a message for Democratic Underground? Click here to send us a message.

© 2001 - 2011 Democratic Underground, LLC